Vigil Contracting was called to replace the underground gas distribution system for 106 townhomes in Baltimore, Md. We installed a new medium density poly-ethylene (MDPE) piping system to replace existing underground gas mains; completed fusion welding of all pipe connections and fittings; excavated and installed 106 underground laterals; and completed a cut, trench and directional boring of over 5000 linear feet of gas main.

Project Gallery

Back to Portfolio