From excavation, demolition, and concrete construction to drywall, flooring, and MEP, Vigil Contracting is equipped with the right talent to take on a wide mix of construction projects.

Rosemont Townhomes
Vigil Contracting was called to replace the underground gas distribution system for 106 townhomes in Baltimore, Md. We installed a new medium density poly-ethylene (MDPE) piping system to replace existing underground gas mains; completed [...]

Bernard E. Mason Senior Apartments
A 225-unit multi-family high-rise senior living facility in Baltimore, Md. needed a complete renovation of each unit and the common areas. Vigil Contracting replaced and upgraded the domestic water system as well as all [...]

Govan’s Manor Apartments
Vigil Contracting completed the demolition and renovation of a 192-unit high-rise senior living apartment building in Baltimore, Md., from water, sewer, vent and gas piping systems to framing, drywall and the complete installation of [...]

Stoddert Terrace, D.C. Housing Authority
In Washington, D.C., Vigil Contracting removed the existing shingle and TPO roofing systems on 28 garden-style apartment buildings, upgrading each to include full roof replacement, decking, gutters and downspouts, soffit, fascia, gable ends and [...]

Fort Belvoir Army Base
The Black Hawk hangar at Fort Belvoir Army Base received a complete renovation by Vigil Contracting, including a number of industry-best safety upgrades. We replaced the entire mechanical system in the office space and [...]

Fort Detrick
Vigil Contracting was meticulous about the complete renovation of a Biosafety Level 3 Laboratory (BSL-3). The building required decontamination before we began as it is used for biocontainment of pathogens. Our efforts focused on [...]

38 New York Ave, D.C. Housing Authority
Vigil Contracting completed a full renovation of a 3,600 square foot historical townhome on one of the main routes into Washington, D.C. The three-story townhome had four brick walls, two badly deteriorated floors and a [...]

Horizon House
Vigil Contracting completed a full demolition and renovation of a tower in a high-rise public housing apartment building in Washington, D.C., from mechanical, electrical and plumbing infrastructure to framing, drywall and fixtures. The overhauled [...]